Baker Hicks - Falkirk Library

CDM UK carried out both joiner and decoration work on behalf of Baker Hicks at Falkirk Library in relation to pre-construction works that are being planned for the near future. The works consisted of cutting out various access locations within the building to allow Baker Hicks engineer to confirm the construction details and materials used during the construction period.




We carried out fabrication works prior to attending site to minimise the works as the works were carried out within a live environment, where both staff and the public were present throughout the time we were on site working.

Both alloy scaffold and podium access equipment and plant were used on site to carry out these works with our dedicated team of professionally trained personnel and our Senior Management in attendance also.